close
The Wayback Machine - https://web.archive.org/web/20110203013203/http://www.oatioasis.com:80/fpl/index.html
   Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • FPL Facility Connection Requirements
    Facility Connection Requirements
    FPL OATT Documents
    2011 Projected Rev Reqmts
    FPL Baseline OATT 8-30-2010
    ATC Algorithm
    Application for Interconnecting a Large Generator
    City of Vero Beach Network Resources
    Contractual Transactions Summer
    Contractual Transactions Winter
    FPL Transmission Studies
    FPL Credit - Form of Guaranty
    FPL Credit - Form of LOC
    FPL Generator Facility Rating Methodology
    Lee County Electric Coop Network Resources
    Queue Priority of Small Generation Interconnection Requests
    FPL Network Resources
    FMPA Network Resources
    Right of First Refusal
    Seminole Network Resources
    FPL CBM Methodology
    Bulk Electric System Facility Rating Methodology
    Queue Priority of Generation Interconnection Requests
    General Information Regarding FPLs Transmission System Capability
    Central Florida Coordinated Study 12-05
    Application for Interconnecting A Small Generator
    OASIS Business Practices
    Charges for Radial T&D Facilities
    Conditional Firm Business Practices
    DNR Application Form
    Distribution of Operational Penalties for Late Studies
    Distribution of Penalties for Unreserved Use Penalties
    Network Customer Guide
    OASIS Business Practices
    Procedure: TSR Submittals during Time Changes
    Operating Procedures for Network Secondary Service
    Miscellaneous Documents
    ATC Native & System Daily Loads
    ATC Native & System Monthly Loads
    Causes for Path with zero ATC
    Factors Affecting ATC on Southern and JEA Paths
    Potential Enforcement Advisory
    Security Coordinator Transfers
    Shift Factors For FPL Plants
    TSR Study Metrics
    TTC with ATC Changes
    FPL Transmission Expansion Plan, Rev. 2009
    TLR Notice and Trariff Sheet
    Denial of Service Log
    TSR Metrics Last 3 Months
    TSR Metrics 10-10
    TSR Metrics 11-10
    TSR Metrics 12-10
    Transmission Planning Notices
    Notice of Florida Power & Light
    Customer Requested Loadflows
    2-27-10_0000-0700
    2-27-10_0700-1300
    2-27-10_1300-0000
    2-28-10_0000-0700
    2-28-10_0700-1300
    2-28-10_1300-0000
    3-1-10_0000-0700
    3-1-10_0700-1300
    3-1-10_1300-0000
    3-2-10_0000-0700
    3-2-10_0700-1300
    3-2-10_1300-0000
    3-3-10_0000-0700
    3-3-10_0700-1300
    3-3-10_1300-0000
    3-4-10_0000-0700
    3-4-10_0700-1300
    3-4-10_1300-0000
    3-5-10_0000-0700
    3-5-10_0700-1300
    3-5-10_1300-0000
    3-6-10_0000-0700
    3-6-10_0700-1300
    3-6-10_1300-0000
    3-7-10_0000-0700
    3-7-10_0700-1300
    3-7-10_1300-0000
    3-8-10_0000-0700
    3-8-10_0700-1300
    3-8-10_1300-0000
    3-9-10_0000-0700
    3-9-10_0700-1300
    3-9-10_1300-0000
    FPL Standards of Conduct Documents
    Affiliates that employee or retain Marketing Function Employees
    Shared Physical Facilities
    Mergers
    Job Descriptions and Organization
    Written Consent
    Notice of Chief Compliance Officer For FPL
    Written Procedures
    Documents
    Emergency Deviation Filing
    Transfers
    This Week
    Last Week
    2 Weeks Ago
    3 Weeks Ago
    4 Weeks Ago
    5 Weeks Ago
    6 Weeks Ago
    7 Weeks Ago
    8 Weeks Ago
    9 Weeks Ago
    10 Weeks Ago
    11 Weeks Ago
    12 Weeks Ago
    OASIS Notices
  • Discretion

  • Personnel

  • 2010 Transmission Rate Filing
    FERC Order 6-29-2010
    Rate Notice
    Summary of Transmission Rates
    Filing Documents 4-30-10
    Filing Letter
    Tabs A-B
    Tab C
    Tab D
    Tabs E - F


    Welcome To

    Florida Power & Light OASIS

    Transmission Customers or prospective customers can communicate with FPL at [email protected]
    FPL's Transmission Rate Filing Notice - FPL�s projected 2011 Annual Transmission Revenue Requirements have been posted (2011 Rev Reqmts under FPL OATT Documents folder). The resulting Transmission component of rates effective 1/1/2011: Year Firm $20,295.02/MW-Yr; Monthly $1,691.25/MW-Mo; Weekly $390.29/MW-Wk; Daily - Peak (M-F) $78.06/MW-Day, Off-Peak (S/S) $55.76/MW-Day; Hourly - Peak (7a-11p M-F Excl Holidays) $4.88/MWh; Offpeak $2.32/MWh.      


    ©2003 OATI webOasisSM - Open Access Technology International, Inc. All Rights Reserved.