close
The Wayback Machine - https://web.archive.org/web/20110901214609/http://www.oatioasis.com:80/fpl/index.html
   Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • FPL Standards of Conduct
  • Emergency Cicumstances Deviations

  • Marketing and Energy Affiliates
  • Shared Facilities

  • FPL Transmission Function Job Descriptions

  • Potential Merger Partners

  • Notice of Transfers
    Information Disclosure
  • Voluntary Consent to Share Non Affill Cust Info

  • Discretionary Actions under Tariff
    Chief Compliance Officer
    Written Procedures for Implementation
    Performance Metrics
    Transmission Study Metrics
    Current TSR Study Metrics
    Transmission Service Request Metrics
    TSR Metrics 5-11
    TSR Metrics 6-11
    TSR Metrics 7-11
    Redispatch Costs
    Redispatch Costs Billed
    Business Practices, Waivers and Exemptions
    Business Practices
    OASIS Business Practices
    Procedure: TSR Submittals during Time Changes
    Charges for Radial T&D Facilities
    Conditional Firm Business Practices
    Distribution of Operational Penalties for Late Studies
    Distribution of Penalties for Unreserved Use Penalties
    Network Service Business Practices
    Network Customer Guide
    Operating Procedures for Network Secondary Service
    DNR Application Form
    Potential Enforcement Advisory
    ATC Information
    Current ATC Implementation Documents
    ATC Implementation Document
    CBM Implementation Document
    TRM Implementation Document
    ATC Methodology Contact
    Load Forecast Descriptive Stmt
    Postback Methodology
    FL-SOU Interface TTC Methodology
    ATC Narratives
    Factors Affecting ATC on Southern and JEA Paths
  • System Data Information

  • Designated Network Resources
    FMPA Network Resources
    Florida Keys Electric Coop Network Resources
    City of Vero Beach Network Resources
    Lee County Electric Coop Network Resources
    FPL Network Resources
    Seminole Network Resources
    Other ATC Baseline Information
    Shift Factors For FPL Plants
    FPL Transmission Expansion Plan, Rev. 2009
    Transmission System Information
    Transmission Studies
    General System Capability Info
    Central Florida Coordinated Study 12-05
    FPL OATT Documents
    FPL Current OATT
    FPL Credit - Form of Guaranty
    FPL Credit - Form of LOC
    Right of First Refusal
    Interconnection Request Information
    Facility Connection Requirements
    Large GIS Requests
    Application for Interconnecting a Large Generator
    Large GIS Request Queue
    Small (under 20 MW) GIS Requests
    Application for Interconnecting A Small Generator
    Small GIS Request Queue
    FPL Facility Ratings Methodologies
    FPL Generator Facility Rating Methodology
    Bulk Electric System Facility Rating Methodology
    2010 Transmission Rate Filing
    2011 Projected Rev Reqmts
    FERC Order 6-29-2010
    Rate Notice
    Summary of Transmission Rates
    Filing Documents 4-30-10
    Filing Letter
    Tabs A-B
    Tab C
    Tab D
    Tabs E - F
    Annual Planning Meeting
    2011 Planning Meeting Notice


    Welcome To

    Florida Power & Light OASIS

    Transmission Customers or prospective customers can communicate with FPL at TransmissionService@fpl.com
    FPL's Transmission Rate Filing Notice - FPL�s projected 2011 Annual Transmission Revenue Requirements have been posted (2011 Rev Reqmts under FPL OATT Documents folder). The resulting Transmission component of rates effective 1/1/2011: Year Firm $20,295.02/MW-Yr; Monthly $1,691.25/MW-Mo; Weekly $390.29/MW-Wk; Daily - Peak (M-F) $78.06/MW-Day, Off-Peak (S/S) $55.76/MW-Day; Hourly - Peak (7a-11p M-F Excl Holidays) $4.88/MWh; Offpeak $2.32/MWh.      


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.